The short answer

Most kitchen renovations in NSW do not need council approval: renovating or replacing a kitchen is exempt development when the room keeps its walls and the structure is untouched. Removing a wall, even a non-loadbearing one, or shrinking a window the room needs for light takes the job out of the exemption, so it needs a CDC or DA. Heritage listings and strata rules add their own checks.

New kitchen in the same room
Usually exempt development
Removing or moving a wall
Needs a CDC or a DA
Kitchen in a strata unit
Owners corporation approval as well
Gas and electrical work
Licensed trades and compliance certificates

Do You Need Council Approval to Renovate a Kitchen in NSW?

Usually not: a kitchen renovation can be exempt development under the NSW Codes SEPP, which means no planning or construction approval from a council or a private certifier, as long as every development standard is met. The standards are what most people never read.

The NSW Planning Portal describes exempt development as work that does not need planning or construction approval from a council or private certifier, provided it meets all of the development standards in the State policy. That policy is the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, usually called the Codes SEPP. Its section 2.51 lists the renovation of a bathroom or kitchen as minor internal building work.

The Housing Industry Association’s explainer, are bathroom and kitchen renovations exempt development, sums up the conditions for NSW. It says the exemption applies to houses and apartments, and that the work must not:

  • Change the configuration of the room, which includes removing a wall, even if the wall is non-loadbearing.
  • Affect the load bearing capacity of the building.
  • Reduce the size of a window or door that the room needs for light or ventilation.
  • Make a change, such as a penetration, to a fire resisting component. This matters most in apartments and attached homes.

Can you move the sink or cooktop without approval?

Yes, relocating fixtures such as sinks and cooktops can still be exempt, according to the HIA, provided the work does not touch the structure or a fire resisting component.

A new layout inside the same four walls is the sweet spot. An island bench, a cooktop on a different wall and a sink under the window can all sit within the exemption. The gas and electrical work that goes with them still needs licensed trades, which is covered further down.

What else applies to every exempt kitchen?

Section 1.16 of the Codes SEPP adds general rules that apply to all exempt work, whatever the room.

The work must meet the relevant deemed-to-satisfy provisions of the Building Code of Australia or be structurally adequate, and it must not make an existing building breach the code. It cannot remove more than 10 m² of non-friable asbestos, or any friable asbestos, unless a licensed asbestos removalist does it. The Planning Portal reminds owners that buildings constructed before 1990 may contain asbestos, which takes in a large share of older Central Coast homes and units.

When Does a Kitchen Renovation Need Council Approval?

A kitchen renovation needs approval when it changes the room or the structure: taking out a wall to open the kitchen to the living area, cutting in a new or larger opening, or adding a beam. That work goes through a complying development certificate (CDC) or a development application (DA).

Opening up a closed-in kitchen is the most common reason a job leaves the exempt pathway, and it surprises people when the wall is not even loadbearing. If it is loadbearing, an engineer has to design the beam that replaces it. Our guide to removing a load-bearing wall walks through what that involves before anyone quotes.

Is it a CDC or a DA?

Many internal alterations to a house can be approved as complying development by a certifier, and the rest need a DA from Central Coast Council.

The Planning Portal’s page on home renovation as complying development says some internal alterations to existing dwellings may be carried out as complying development. They must not change the building’s classification under the Building Code of Australia, create an additional separate dwelling, create an additional floor or convert a basement for residential use. A CDC is generally the quicker path when the site qualifies. Where it does not, such as on some heritage properties, a DA is the route.

What if the House Is Heritage Listed?

Check before you plan anything: exempt development cannot be carried out on land with an item on the State Heritage Register, and Central Coast Council says some work on local heritage items or in conservation areas needs a DA.

Section 1.16 of the Codes SEPP rules out exempt development on land with an item listed on the State Heritage Register or under an interim heritage order. For local listings, Central Coast Council’s heritage advice page says some work on heritage items or in heritage conservation areas will need a development application. It also points out that a heritage listing does not mean a building cannot be modernised or altered, and the Council offers a heritage exemption form for minor works.

The fastest way to see what applies to an address is the NSW Planning Portal’s Spatial Viewer, which Service NSW describes in its guide to searching for planning information about a property. If a heritage layer shows up, call the Council’s heritage team before you lock in a design.

Do You Need Strata Approval to Renovate a Kitchen in a Unit?

Yes, in most cases: NSW treats a kitchen renovation as a minor renovation, which needs approval from the owners corporation by more than 50% of the votes cast at a general meeting. Council approval is a separate question.

The NSW Government’s strata renovation rules list kitchen renovations, such as installing or removing cupboards, as minor renovations. If a by-law allows it, the strata committee can consider the application instead of a general meeting. Under the 2025 strata law changes, where such a by-law exists, the committee must give its reasons in writing within three months, or the renovation is automatically approved.

A kitchen stops being minor once it changes the structure or needs waterproofing. Moving a structural internal wall is a major renovation, which needs a special resolution, meaning no more than 25% of the value of votes cast are against it, and 14 days’ written notice to the owners corporation before structural work starts. Our guide to strata bathroom renovation approval covers the major renovation process in detail.

Does an apartment kitchen have extra exempt development rules?

Yes. Exempt work in an apartment building only qualifies if the building has a current fire safety certificate or fire safety statement, or has no fire safety measures at all.

That rule is in section 1.16(2) of the Codes SEPP. Apartment walls, floors and ceilings can also be fire resisting, which is why a new rangehood duct or a pipe through a slab needs checking before it is cut.

Who Can Do the Work in a Kitchen Renovation in NSW?

A licensed contractor must do residential building work worth more than $5,000 in labour and materials, and gas and electrical work needs licensed trades whatever it is worth. Exempt from approval does not mean exempt from licensing.

NSW’s page on general building work lists bathroom, kitchen or laundry renovations as work that needs a building licence. The categories of building and trade work page adds that specialist work, including plumbing, gasfitting and electrical, needs a licence regardless of the cost. Jobs over $5,000 need a written contract, and projects over $20,000 must be covered by home building compensation insurance before any money changes hands.

Gas is the one people try to shortcut. NSW’s guide to using a gasfitter says only licensed gasfitters can do repairs or renovations involving gas, including relocating or replacing a gas appliance, and the gasfitter must give you a compliance certificate afterwards. Electricians must lodge a certificate of compliance for electrical work for any job that installs, repairs or alters electrical equipment, which includes swapping an oven. If the kitchen is one part of a bigger job, our page on home renovations explains how one licensed builder runs every trade.

So Do You Need Approval for Your Kitchen Renovation?

If the kitchen stays in the same room, no walls move, no window gets smaller and nothing structural changes, it is usually exempt and needs no council approval. Opening it up to the living area, a heritage listing or a strata title each bring in an approval step.

Settle the approval path before the cabinetmaker draws anything. A layout that needs one wall gone is a different project, with an engineer, a certifier and a longer lead time, from one that works around the walls already there. Knowing which one you are buying keeps the design and the budget honest.

Williamson Builds renovates kitchens across all of the Central Coast, with Newcastle and Sydney by arrangement for larger jobs, under builder’s licence 399743C with $10 million in public liability cover. This guide is general information for NSW and is not legal or planning advice. Planning rules change, so confirm the current Codes SEPP and Central Coast Council requirements for your address before work starts.

Written by

Hamish Williamson

Director and licensed builder, Williamson Builds, licence 399743C

Hamish has spent more than ten years on the tools, including high-end residential work in Dee Why and Annandale before starting Williamson Builds on the Central Coast. He checks every guide on this site before it goes up.

NSW licence 399743C · Certificate III in Carpentry · Certificate IV in Building and Construction. Search the licence number on the Building Commission NSW register.

Last reviewed 29 October 2026

More about Hamish and Williamson Builds

GET MY FREE QUOTECall 0420 221 420

Hamish Williamson, director and licensed builder at Williamson Builds

Start here

Tell Us About Your Job

A sentence and a couple of photos is enough for us to know how to help. If someone else is the better call, we’ll say so in the reply.

  • Licence 399743C
  • Public liability insured
  • 5/5 from 25+ Google reviews

Get a free quote

Name

We reply within one working day. No obligation, no sales call.

Call 0420 221 420