Do You Need Strata Approval to Renovate a Bathroom in NSW?
Yes. The NSW Government’s strata renovation rules say you need permission to do a kitchen or bathroom renovation. For a bathroom, that permission is a vote of the owners corporation.
NSW sorts renovation work in a strata scheme into three groups, and the group decides who has to say yes:
- Cosmetic work needs no approval. It covers changes that don’t affect the structure or outside of the property and don’t require waterproofing, such as painting, laying carpet, filling small cracks and fitting blinds or built-in wardrobes.
- Minor renovations need approval by more than 50% of the votes cast at a strata meeting, or by the strata committee if a by-law allows it. Kitchen renovations, changes to internal walls and new hard flooring are on this list.
- Major renovations need a special resolution at a general meeting. NSW lists changes that require waterproofing, changes to the structure or the outside, and changes to the ceiling.
Why is a bathroom a major renovation?
Because of the waterproofing. NSW names bathroom renovations as an example of a major renovation.
Minor renovations cannot change the structure or require waterproofing, and a bathroom that is stripped and retiled gets a new membrane. That membrane is the only thing between your shower and the ceiling of the unit below, which is why every owner gets a vote on it. A special resolution means no more than 25% of the value of the votes cast are against the work. In a two-lot scheme, both owners must agree.
Is a kitchen treated the same way?
No. NSW lists kitchen renovations, such as installing or removing cupboards, as minor renovations.
A kitchen moves up to a major renovation if it changes the structure, for example by taking out a structural wall, or needs approval under other laws. Our guide to removing a load-bearing wall covers what that involves, and the kitchen renovations page covers the work itself.
How Do You Get Strata Approval for a Bathroom Renovation?
Ask your strata manager or secretary to put a motion to a general meeting, and give the owners enough detail to vote on.
Only the owners corporation can approve a major renovation, at an annual general meeting or another general meeting. NSW adds three requirements that are easy to miss:
- The special resolution must state who is responsible for the ongoing maintenance of the common property affected, the owners corporation or the lot owner.
- If the renovation affects common property, you may need to change the scheme’s by-laws, and any owners affected need to agree in writing.
- If the work changes the structure, you must also give the owners corporation 14 days’ written notice before it starts.
What will the owners corporation want to see?
Plans of the work with dates and times, and the qualifications and details of the tradespeople who will do it.
That is what NSW says an owner must show for a minor renovation, and a committee will expect at least as much for a bathroom. In practice, add the extent of the new waterproofing, the builder’s licence number and insurance certificate, how materials and rubbish will move through the common areas, and who will maintain the new work afterwards. A written scope from the builder answers most of these before anyone has to ask.
How long does strata approval take?
As long as it takes to get the motion to a general meeting.
NSW warns that you may need to wait for a strata meeting to be held so owners can vote. One of the strata law changes that started on 1 July 2025 treats a minor renovation as approved if a strata committee does not refuse it in writing within three months. That change does not help with a bathroom. It applies only to minor renovations, and only where a by-law lets the committee decide them. Get the scope written before the meeting notice goes out, so the vote and the start date line up.
Who Owns the Waterproofing and Tiles in a Strata Bathroom?
It depends on your strata plan and by-laws, but once an owner renovates, the new tiles and membrane are usually the owner’s to maintain.
NSW publishes a common property memorandum that a scheme can choose to adopt. Under it, the owners corporation is responsible for original floor tiles and the waterproofing fixed to common property floors, and for pipes within a common property wall, floor or ceiling. The lot owner is responsible for floor tiles and waterproofing an owner has fixed after the strata plan was registered, along with the bath, toilet, basin, shower screen, taps and cabinets.
So the day your new membrane goes down, responsibility for it is likely to move from the building to you. That is one more reason to have it done by someone licensed, to the standard, with photos of the membrane before the tiles cover it. NSW’s page on strata repairs and maintenance sets out the general split: the owners corporation looks after boundary walls, the slab and plumbing in boundary walls and under the floor, and owners generally look after what is inside the lot.

Does a Strata Bathroom Renovation Need Council Approval?
Often not. A bathroom renovation can be exempt development in NSW, in apartments as well as houses, if it meets the standards in the state planning code.
The Housing Industry Association’s guide to bathroom and kitchen renovations as exempt development explains that replacing or renovating a bathroom can be exempt, including new waterproofing, re-tiling and new fixtures. The limits matter in a unit. The work must not change the configuration of a room, must not affect the load bearing capacity of the building, and must not change a fire resisting component. HIA gives the walls, floors and ceilings that separate one unit from another, or from a common space, as examples of fire resisting components. Outside those limits the work needs development consent, and Central Coast Council is where a development application goes.
Planning approval and strata approval are separate. Being exempt from one does nothing for the other.
Do the Design and Building Practitioners rules apply to a unit bathroom?
They can. Apartment buildings are regulated under that law, and waterproofing is only excluded when three conditions are met.
NSW’s guidance on building work in regulated buildings says waterproofing is excluded only if it results from alterations to a bathroom, kitchen, laundry or toilet, the work relates to a single dwelling, and it is exempt development. Outside those conditions, a registered design practitioner has to prepare regulated designs before the work starts. Ask whoever quotes which side of that line your bathroom falls on, and get the answer in the scope.
Who Can Renovate a Bathroom in a Strata Unit?
A licensed contractor. NSW’s strata rules tell owners to make sure any building contractor or tradesperson has a valid contractor licence.
A contractor licence is required for residential building work worth more than $5,000 in labour and materials, and for specialist work such as plumbing and electrical at any value, under NSW’s categories of building and trade work. A general builder can do any residential building work. A kitchen, bathroom and laundry renovation licence does not cover work affecting any load bearing part of the building. Our guide to choosing between a builder or a bathroom company goes through when that difference matters.
The standard is set nationally. The National Construction Code requires wet areas in apartment buildings to be impervious to water in line with AS 3740, and says overflows from bathrooms must be prevented from penetrating downwards to another unit, under Part F2 of NCC 2022 Volume One. You can check any licence on the Service NSW licence check.
What about asbestos in an older unit?
Asbestos may still be found in bathrooms built or renovated before 1990, according to asbestos.nsw.gov.au.
The site says asbestos can be found in adhesives such as grout, sealants and putties, and older bathrooms were often lined with cement sheeting. In a strata building, dust from one unit can travel through shared spaces, so this needs to be settled before strip-out. Tell the builder the age of the building and expect testing to be part of the scope.
What Should a Strata Committee Check Before It Votes?
Check the scope, the licence, the waterproofing and who maintains the work afterwards.
A committee or strata manager reading a renovation motion is protecting every other owner in the building. Six questions cover most of the risk:
- Is there a written scope that says what is being removed, what is being built and where the new membrane starts and stops?
- Is the contractor licensed for the work, and is there a current insurance certificate on file?
- Does the work touch a wall, floor or ceiling that separates the unit from a neighbour or from common property?
- Does the resolution state who maintains the affected common property from now on?
- Are the dates, working hours, lift use and rubbish removal set out, in line with the by-laws?
- Will there be photos of the work before it is covered, for the strata records?
What happens if an owner renovates without approval?
NSW says an owner who does not get permission for a major renovation may need to pay to put the property back to how it was.
Disputes go to the NSW Civil and Administrative Tribunal, which lists orders it can make about alterations to common property and repairing damage. An unapproved bathroom also tends to surface at the worst time: when it leaks, or when the unit is being sold.
So What Should You Do Before a Strata Bathroom Renovation Starts?
Read the by-laws, get a written scope from a licensed builder, put the motion to a general meeting, and book the work only once the special resolution has passed.
The order matters because the scope is what the owners vote on. A motion that says “renovate bathroom” invites questions and delay. A motion with a scope, a licence number, an insurance certificate and dates gives owners something they can approve at the first meeting.
Williamson Builds renovates bathrooms in units and townhouses across all of the Central Coast, including apartment buildings in Gosford and The Entrance, with Newcastle and Sydney by arrangement for larger jobs. The work is done under builder’s licence 399743C with $10 million in public liability cover, and strata managers can send work through the property managers page. This guide is general information for NSW and is not legal advice. Check your scheme’s by-laws and the NSW Government pages linked above for the current rules.