
Outside
Decks, pergolas and outdoor rooms, set out on site to your block.
Licensed builder · 399743C

Around Shelly Beach, Williamson Builds builds decks, pergolas and outdoor rooms, repairs decks the weather has worked on, and renovates bathrooms, kitchens and homes. You get a written scope before the price and a licensed builder on site.
The short answer
Williamson Builds is a carpentry and building company working in Shelly Beach, NSW 2261. Decks, pergolas and outdoor spaces; home maintenance and repairs; bathroom and kitchen renovations run end to end. Everything is built on site under NSW licence 399743C and quoted from a written scope rather than a rate per square metre.
Check one number before you draw anything. In the coastal hazard zones at Shelly Beach, Council’s northern-area chapter caps timber decks and viewing platforms at 20 square metres and a metre above ground. That works out to about four by five metres, or half the entertaining deck most people have in mind.
What we do here
Pick the one that sounds like your job, or ring and describe it.

Decks, pergolas and outdoor rooms, set out on site to your block.

Opened up and checked before it is quoted, so you pay for the fix it needs.

Bathrooms, kitchens and bigger renovations, with the trades and the dates run by us.
Reviews
The difference
What decides how long a job lasts ends up under the boards or behind the wall, so that’s where most of our time goes.
Sloping ground, trees and salt air decide the footings, the fixings and which timber lasts. Inside, new work is tied into the structure of the house. Every job is set out on site, to the block it sits on.
The scope of works goes out in writing first, saying what is in it and what is not, and the number follows. Unknowns such as what sits under the ground are named as provisional items before you sign.
We pull a section and look at the structure before pricing a repair, whether it is a deck, a subfloor or a wall. If what’s behind it is sound, you pay for the repair and nothing more.
Exempt, complying development or a full DA depends on your block as much as your job, and it changes street to street here. We check it against your address before quoting and tell you which one applies.
Licence 399743C is a general building licence, so the structural work, the licensed trades and the schedule all sit with us. One number to ring, whether you live in the house or manage it.
Substructure, framing and waterproofing all get covered up, and that is where a job is either right or not. Those stages are photographed and handed over, so nothing is taken on trust.
Recent work
Photos from our own jobs across the Coast.

Pergola

Pool deck

Pergola

Fencing

Carpentry

Bathroom
Local knowledge
Four things that change the job here. Sources are at the foot of the page.
Shelly Beach has Council-drawn coastal hazard planning lines. In the high-risk and immediate-risk zones, the table permits “timber decks and viewing platforms, max. 20 m², max. 1 m from ground”. Twenty square metres is roughly 4 m by 5 m. We haven’t established which lots fall in which zone; that’s in Council’s mapping.
What it means for youIf you’re planning a 40 m² deck on a hazard-zone lot, ask before paying a designer.
The flat-or-apartment row for Shelly Beach reads zero, against 21.7 per cent across NSW. That matters for access, because every job here is entered from its own street frontage, with its own side access and yard. There’s no lift to book, no shared roof and nobody living below the floor you’re opening up, so the work runs on an ordinary week without booking around a building. It’s also why decks and outdoor rooms are the core work here.
At two tested points, Shelly Beach is R2 Low Density Residential, with a 9.5 metre maximum height, a metre above the 8.5 most of the Coast runs on. At a third, on the western side, it’s R1 General Residential, with no height limit or minimum lot mapped. You can’t tell which is which from the street. On the R1 side, the height of a raised deck or upper balcony is argued on merit.
Shelly Beach falls under the northern part of Council’s floodplain chapter, which sets floor levels by number. Habitable floors sit at the 1 per cent flood level plus 500 mm freeboard, and non-habitable floors, such as a laundry, garage or enclosed outdoor room, at the 5 per cent flood level.
What it means for youOn low ground that number shapes a renovation or a covered outdoor space before anything else does, so we check it against your address first.
Hamish walks the site with you, then you get a written scope before any price. No obligation.
How it works
The same three steps whether it is a repair or a renovation.
Step 01
We spend most of the visit on what limits the job, such as the fall across the footprint, drainage, tree roots, where the sun lands at four in the afternoon, how the deck meets the door threshold and what the salt is going to do to the fixings. Inside, we look at what’s behind the wall and where the services run.
Step 02
You get an itemised scope in writing before any number is discussed. It covers materials, fixings, finishes, rubbish removal and who carries what risk. Put it beside any other quote you’ve been given and you’ll see the difference.
Step 03
The schedule runs from start to handover and is in writing. The price is fixed against that scope, and anything outside it is agreed with you before it happens.
Questions
Scope questions are here. Job-specific ones are on the service pages.
We do the full range, including decks, pergolas and outdoor spaces; doors, windows, flooring and fencing; timber and deck repairs; and bathroom and kitchen renovations. This is a detached-house suburb with no apartments in it at all, so every job has its own yard and its own access, which makes outdoor work the core of what we do here.
Yes. We work under NSW licence 399743C, held by our director Hamish Williamson, who holds a Certificate III in Carpentry and a Certificate IV in Building and Construction. Search the number on the Building Commission NSW register before you speak to anyone.
That depends on whether your lot is in one of the coastal hazard zones, and it is the first thing to check. In the high-risk and immediate-risk zones Council’s table caps timber decks and viewing platforms at 20 m² and a metre above ground, which is roughly 4 by 5 metres. Outside those zones the ordinary rules apply. Which zone your lot is in comes from Council’s mapping, so we ask before designing.
It depends on the job and where you are. A deck can be exempt development if it stays inside tight limits, such as under 25 m², under a metre off the ground and 900 mm off the boundary. Shelly Beach adds two local variables: the coastal hazard zones on the seaward side, and a zoning split that changes your height limit and minimum lot size depending on which part of the suburb you are in.
Either 9.5 metres or not mapped at all, depending on your zone. The low-density residential land here is mapped at 9.5, a metre more than most of the Central Coast. On the general residential land on the western side, neither the height nor the minimum lot size is mapped, so height is argued on merit instead of being a set number. Your planning certificate settles which applies.
It can change the design. Council’s northern floodplain chapter sets habitable floors at the 1 per cent flood level plus 500 mm freeboard and non-habitable floors at the 5 per cent flood level, so on low ground the floor height is set by a number rather than by preference. We check your address against Council’s flood information before anything is priced.
Almost never. Shelly Beach has no apartments at all and only about sixty townhouses in the whole suburb, so the overwhelming majority of jobs are straight owner-to-builder with no committee, no common property and no access booking. That makes it one of the easier suburbs on the Coast to build in.
Nearby
The same licence and written scope apply here.
Start here
A sentence and a couple of photos is enough. You don’t need to know what the job is called.
About the local information on this page. This is general information about building in the area, and planning rules and flood mapping change over time. It isn’t a substitute for a planning certificate or flood certificate for your own property. We check those for your address before quoting.
Last checked September 2026.