
Outside
Decks, pergolas and outdoor rooms, set out on site to your block.
Licensed builder · 399743C

New decks, outdoor rooms and pergolas, deck and timber repairs, and bathroom and kitchen renovations are the work Williamson Builds does around MacMasters Beach, all scoped in writing and built on site by a licensed builder.
The short answer
Williamson Builds is a carpentry and building company working in MacMasters Beach, NSW 2251. Decks, pergolas and outdoor spaces; home maintenance and repairs; bathroom and kitchen renovations run end to end. Everything is built on site under NSW licence 399743C and quoted from a written scope rather than a rate per square metre.
MacMasters Beach has almost no mapped planning constraint. There is no foreshore building line, flood map, scenic protection layer, environmentally sensitive land, local provision or site-specific chapter, and the minimum lot is a plain 550 m². Instead, Council has a written description of the suburb’s character, and every development application has to be argued against it. That is unusual, and it drives most of the planning work here.
What we do here
Pick the one that sounds like your job, or ring and describe it.

Decks, pergolas and outdoor rooms, set out on site to your block.

Opened up and checked before it is quoted, so you pay for the fix it needs.

Bathrooms, kitchens and bigger renovations, with the trades and the dates run by us.
Reviews
The difference
What decides how long a job lasts ends up under the boards or behind the wall, so that’s where most of our time goes.
Sloping ground, trees and salt air decide the footings, the fixings and which timber lasts. Inside, new work is tied into the structure of the house. Every job is set out on site, to the block it sits on.
The scope of works goes out in writing first, saying what is in it and what is not, and the number follows. Unknowns such as what sits under the ground are named as provisional items before you sign.
We pull a section and look at the structure before pricing a repair, whether it is a deck, a subfloor or a wall. If what’s behind it is sound, you pay for the repair and nothing more.
Exempt, complying development or a full DA depends on your block as much as your job, and it changes street to street here. We check it against your address before quoting and tell you which one applies.
Licence 399743C is a general building licence, so the structural work, the licensed trades and the schedule all sit with us. One number to ring, whether you live in the house or manage it.
Substructure, framing and waterproofing all get covered up, and that is where a job is either right or not. Those stages are photographed and handed over, so nothing is taken on trust.
Recent work
Photos from our own jobs across the Coast.

Deck

Pool deck

Pergola

Fencing

Carpentry

Bathroom
Local knowledge
Four things that change the job here. Sources are at the foot of the page.
Council’s DCP includes a character statement describing MacMasters Beach as “more traditional and vernacular, smaller scale, more protected and more vegetated”, set against Copacabana. A development application has to demonstrate its consistency or compatibility with it, and the list expressly includes “garden design, including outdoor structures”.
What it means for youThat means a bulky raised deck that would pass without comment 1.5 km north has a harder path here, and it is easier to design to the statement than to argue with it.
Bouddi National Park adjoins MacMasters Beach along its southern edge, and homeowners often assume that adds rules, but it doesn’t. There’s no referral to National Parks, no concurrence and no buffer clause for land next to a reserve, and being next to the park doesn’t cost you the complying-development pathway.
What it means for youWhat does carry across the fence is bushfire mapping, and even that is patchy, so check it for your own block.
We queried the State planning layers one by one. No foreshore building line, no scenic protection land, no flood planning map, no landslide risk mapping. The minimum lot size is a plain 550 m². With no hard number to design around, the main thing that shapes an application is the character test, which is a judgement rather than a measurement.
What it means for youThat is why we talk about how a job looks from the street before we talk about cost.
35.6 per cent of dwellings had nobody home on Census night, against 9.4 across NSW. In practice, access and scheduling are a big part of the job here, and out-of-season work is easier to run than January work. It also means every occupied-dwelling figure describes only two-thirds of the houses: when a page says 57 per cent have four or more bedrooms, that’s 57 per cent of the homes lived in that night, not of the suburb.
Hamish walks the site with you, then you get a written scope before any price. No obligation.
How it works
The same three steps whether it is a repair or a renovation.
Step 01
We spend most of the visit on what limits the job, such as the fall across the footprint, drainage, tree roots, where the sun lands at four in the afternoon, how the deck meets the door threshold and what the salt is going to do to the fixings. Inside, we look at what’s behind the wall and where the services run.
Step 02
You get an itemised scope in writing before any number is discussed. It covers materials, fixings, finishes, rubbish removal and who carries what risk. Put it beside any other quote you’ve been given and you’ll see the difference.
Step 03
The schedule runs from start to handover and is in writing. The price is fixed against that scope, and anything outside it is agreed with you before it happens.
Questions
Scope questions are here. Job-specific ones are on the service pages.
Decks, pergolas and outdoor spaces; doors, windows, flooring and fencing; timber and deck repairs; and full bathroom and kitchen renovations. If the job is carpentry, or the carpentry is the hard part of it, it’s ours.
Yes. We work under NSW licence 399743C, held by our director Hamish Williamson, who holds a Certificate III in Carpentry and a Certificate IV in Building and Construction. Search the number on the Building Commission NSW register before you speak to anyone.
For most jobs the ordinary rules apply, and very little is mapped over this suburb: no foreshore building line, no flood map, no scenic protection layer, and a plain 550 m² minimum lot. A deck can be exempt development if it stays inside tight limits. The difference here is that anything needing a development application is assessed against Council’s written character statement for the suburb, which specifically mentions outdoor structures.
In practice, scale and visibility matter more here than they would a few kilometres north. The statement describes MacMasters Beach as smaller-scale, vegetated and traditional, and contrasts it with the bulkier new building at Copacabana. A large raised deck or a bulky roofed outdoor room is the kind of thing it is aimed at. Designing to it is easier than arguing with it, so we raise it at the site visit.
No, which surprises people. There is no referral to National Parks, no buffer clause and no loss of the fast complying-development pathway just from adjoining the reserve. The one thing that does cross the boundary is bushfire mapping, and even that is patchy here; some southern-end lots pick up a vegetation buffer and land a few hundred metres north returns nothing. Your planning certificate will tell you where your block stands.
Yes. A lot of work here runs that way, because this is the emptiest suburb on the coast, with better than a third of houses unoccupied on Census night. We write the scope before anything starts, send photos at the stages that matter rather than a running commentary, and schedule the disruptive parts well out of season. It works far better in winter than in January.
Often, yes. Houses in MacMasters tend to have more rooms than people (about 1.4 bedrooms per resident), and most are owned outright, so the decision is discretionary rather than a borrowing one. That usually points toward one excellent bathroom, a kitchen built for two who cook, or a deck specified to last twenty years, rather than adding floor area nobody needs.
Nearby
The same licence and written scope apply here.
Start here
A sentence and a couple of photos is enough. You don’t need to know what the job is called.
About the local information on this page. This is general information about building in the area, and planning rules and flood mapping change over time. It isn’t a substitute for a planning certificate or flood certificate for your own property. We check those for your address before quoting.
Last checked September 2026.