Licensed builder · 399743C

Deck Repairs – Central Coast

Composite decking with an ocean view, a Williamson Builds job at Forresters Beach on the Central Coast

Williamson Builds inspects, repairs and restores timber decks across the Central Coast. Rotted or cupped boards, corroded fixings, loose balustrades, stairs that have dropped, soft joists and bearers, posts gone at ground level, or the ledger where the whole thing bolts to the house. Often the frame is sound and only the top needs doing, which is worth knowing before anyone quotes you a rebuild.

Get my free quoteCall 0420 221 420

5/5 from 25+ Google reviews

  • Licence 399743CVerifiable on the NSW register
  • Public liability insuredNRMA · $10 million
  • Fixed written scopeIssued before the price
  • Workmanship warrantyIn writing, at handover

The short answer

Williamson Builds: Licensed Deck Repairs on the Central Coast

Williamson Builds repairs timber decks across the Central Coast of New South Wales under NSW builder’s licence 399743C. Boards, joists, bearers, posts, footings, ledgers, stairs and balustrades are checked from underneath before anything is priced, so a sound frame gets new boards instead of a new deck.

Most deck repairs take one to five days on site. If the frame has gone, we say so, show you the timber that has failed, and quote the rebuild as a separate option so you can compare the two side by side.

Service area
All of the Central Coast, NSW
Typical repair
1 to 5 days on site
Priced
After the frame is checked
Licence
NSW 399743C
Scope
In writing, before the price

What we fix

Deck Repairs From the Boards Down to the Footings

Most people ring about the boards. The boards are usually the symptom, so the repair starts wherever the problem actually is.

  1. Boards

    Split, cupped, soft or lifting boards, replaced in the same species and profile where it is still made. Sound boards around them stay put. Before anything is re-laid we check the joist tops underneath, because that is where a re-board most often goes wrong.

  2. Joists and Bearers

    A deck that bounces or dips has a frame problem. We replace or double up the members that have gone, fix whatever let the water in, and tape the joist tops so the new timber doesn’t fail the same way.

  3. Posts and Footings

    Posts rot at the ground line, where water sits and nobody looks. We replace them in timber rated for ground contact or stand them on steel stirrups clear of the soil, and reset footings that have moved.

  4. The Ledger

    The ledger is the timber that bolts the deck to the house, and it is the one joint holding the whole thing up on that side. When the flashing above it fails, water runs in behind it and it rots from the back. We check it on every deck and fix the flashing along with the timber.

  5. Stairs and Balustrades

    Stairs that have dropped or pulled away, loose handrails, wobbly balusters, and treads that have split or gone slippery. A balustrade is a safety barrier first, so any section we replace is built to the current rules, which are set out further down this page.

  6. Fixings

    Galvanised screws near the water rust, streak the boards and lose their grip well before the timber gives up. Within the salt zone we refix in stainless, which on an otherwise sound deck can be most of the job.

Reviews

What Our Customers Say

Posted on Google Google
Joao Pinto profile picture
Joao Pinto
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
⭐⭐⭐⭐⭐ Absolutely amazing work! We recently had our deck built, and the final result looks incredible! The quality of the workmanship, attention to detail, and overall finish exceeded our expectations. The whole process was smooth and professional, and we couldn’t be happier with how everything turned out. It has completely transformed our outdoor space. Highly recommend to anyone looking for a reliable builder who takes pride in their work. Thanks again for such a fantastic job!
Posted on Google Google
Jesús Gutiérrez profile picture
Jesús Gutiérrez
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great communication and good workmanship! 100% recommended! He organised the plaster and painter for us and gave us a reasonable price even when we kept finding and adding more scope. Thanks Hamish for being patience with us and for the suggestions provided on how to improve our home (carpentry, painting and planting work) without breaking the bank!
Posted on Google Google
Sandra Mason profile picture
Sandra Mason
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Hamish and the team recently replaced our old pool decking with Ekodeck in Terrigal and we’re really happy with the result. It’s completely transformed the area and looks great around the existing pool. Easy to deal with, tidy and everything was finished really well. Would definitely recommend Williamson Builds!
Posted on Google Google
Tameka Kitchener profile picture
Tameka Kitchener
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Hamish and the boys recently built our deck and pergola and did such a great job. Really happy with how it all turned out. They were easy to deal with, always showed up when they said they would and kept everything tidy. Would happily recommend them!
Posted on Google Google
Armen Makaradi profile picture
Armen Makaradi
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Hamish and his team recently renovated our bathroom in Wyoming and we’re so happy with how it turned out! Hamish was reliable, easy to deal with and kept us updated the whole way through. The team were friendly, tidy and did an amazing job. Would definitely recommend Williamson Builds!
Posted on Google Google
Lorraine Martin profile picture
Lorraine Martin
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Hamish and Jake completed our new ensuite and other work that we needed done in our house. Hamish was punctual and explained to us what work would be done on that day and any other extra work which might be required. Hamish also arranged the other tradesmen to come which made it much easier for us and was reasonably priced. Everyone who has seen the renovations remark on how the work that was completed was very impressive. We would highly recommend Hamish if anyone requires renovations to be done in their house as the work that he done for us was excellent. Thanks Hamish Robert and Lorraine from Wyoming.
Posted on Google Google
Alana Russell profile picture
Alana Russell
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Exceptional work, communication and timeliness. Highly recommend..
Posted on Google Google
robyn goring profile picture
robyn goring
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Professional job, skilful workers, polite, punctual and reasonable price. Accomodating and good communication. Happy to recommend.
Posted on Google Google
Libby Hudson profile picture
Libby Hudson
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Hamish & his team recently completed a new deck at my house and some timber joist replacements. Hamish is very well spoken which gave us much confidence throughout the whole process. They are punctual & communicated well throughout the whole process, great carpenters.
Verified by Trustindex
Trustindex verified that these reviews were published on Williamson Builds's Google Business Profile. Learn more

The difference

Why Central Coast Homeowners and Property Managers Choose Us for Deck Repairs

Plenty of people will re-board a deck. The difference shows up in whether anyone looked at the frame first, what the new fixings are made of, and whether the same person is still answering the phone in twelve months.

Hamish Williamson, director and licensed builder at Williamson Builds
Hamish Williamson Director and licensed builder · Licence 399743C About Hamish
  1. Repairs Built for Decks on This Coast

    Salt air, sloping ground and trees decide what fails on a deck here and what the repair has to be made of. The new timber and fixings are chosen for where your deck sits, not taken from a standard list.

  2. The Scope Comes Before the Price

    The scope of works goes out in writing first, saying what is being replaced and what is staying, and the number follows. Anything we can’t see until the old timber is out is named as a provisional item before you sign.

  3. We Check the Frame First

    A few boards come up and the joists, bearers and posts are probed before the repair is priced. If the frame is sound, you get the repair rather than the rebuild.

  4. Approval Checked Before You Commit

    A like-for-like deck repair generally needs no approval, but rebuilding or enlarging a deck can, and the rules change street to street here. We check it against your address before quoting and tell you which applies.

  5. One Licensed Builder From Inspection to Handover

    Licence 399743C is a general building licence, so the structural repair, the balustrade and any other trade the job needs all sit with us. One number to ring, whether you live in the house or manage it.

  6. Photos of the Frame Before the Boards Go Back

    Joists, bearers, posts and the ledger all disappear under the boards again, and that is where a repair is either right or not. Those stages are photographed and handed over, so nothing is taken on trust.

Before you ring

Six Things Your Deck Is Telling You, and What Each One Means

You can check most of these yourself in ten minutes. They are the same things we look at first when we arrive.

  1. Underfoot

    Soft Spots Along the Joist Lines

    If a board feels spongy where it sits on a joist rather than between joists, the rot has reached the frame. That turns a board job into a structural one.

  2. Movement

    A Bounce or Sway When You Walk Across It

    Usually undersized or rotten joists, a bearer that has dropped, or a footing that has moved. Worth getting looked at before the next time there is a crowd on it.

  3. Fixings

    Rust Streaks Running From the Screw Heads

    The screws are corroding and the timber around them is holding water. Near the beach this is often the first thing on a deck to fail.

  4. Balustrade

    A Handrail That Moves When You Lean on It

    The posts holding it are loose or rotten at the base. This is the one on the list not to leave, because the balustrade is all that stands between someone and the drop.

  5. Boards

    Cupping, Splitting, or Gaps That Have Closed Up

    Boards laid too tight, or with no airflow underneath, swell and cup. Closed gaps also trap leaves and water on top of the joists, which is how the frame starts to go.

  6. Underneath

    Dark, Damp or Crumbly Timber Under the Deck

    Look at the posts where they meet the ground and at the ends of the bearers. Timber that is stained, damp or soft under a screwdriver needs replacing, however good the top looks.

Send us photos of any of these, including one from underneath if you can get it, and we’ll tell you whether it sounds like a repair or something bigger.

The main decision

Repair or Rebuild: The Frame Decides, Not the Boards

Two decks can look equally tired from the top and need completely different jobs. What is holding them up is what settles it.

Repair

The frame is solid, the footings haven’t moved, and the damage is in the boards, the balustrade, the fixings or one section of structure. You keep the frame you already paid for and replace what has failed.

Usually means

New boards, a refix in stainless, a run of joists, new posts or a rebuilt stair.

Worth knowing

New timber stands out against weathered timber for a season or two. Oiling narrows the difference and time closes it.

Rebuild

The frame is soft in several places, the footings have moved, or the deck has been patched before and the patch has failed. At that point a repair costs most of a new deck without lasting like one.

Usually means

A new substructure, often on the same footprint, set out for the block and the salt exposure at your address.

Worth knowing

If we recommend a rebuild, you see the failed timber before you see a quote. Anyone can check whether a frame is sound, so get a second opinion if you want one.

A company that sells deck systems will quote you a deck system, because that is the product. A builder can open the frame, find it sound and replace only the boards. We would rather tell you that and be the people you ring when you do want the new deck.

Balustrade rules

When a Repair Includes the Balustrade, These Are the Rules It Is Built To

The National Construction Code sets four numbers for the barrier on a house deck. Any balustrade we replace meets all four. An old one that doesn’t is worth knowing about, even if nothing is making you change it.

  1. When

    A Barrier Is Needed Once the Fall Is 1 M or More

    Measured from the deck to the ground below it. Plenty of decks here start at ground level off the back door and finish well over a metre above the yard, so the rule can apply to one end of a deck and not the other.

  2. Height

    At Least 1 M Above the Deck

    On stairs the minimum is 865 mm above the tread nosings, but on the deck itself it is a metre. Older decks often sit lower than that.

  3. Gaps

    No Opening a 125 Mm Sphere Can Pass Through

    That covers the gaps between balusters and the gap under the bottom rail. It is sized so a small child can’t get their head through.

  4. Climbing

    Above a 4 M Fall, Nothing a Child Can Climb

    Where the drop is more than 4 m, horizontal parts of the barrier between 150 mm and 760 mm above the deck must not make it climbable. Horizontal wires and rails are the usual problem on high decks.

National Construction Code 2022, ABCB Housing Provisions Part 11.3, clauses 11.3.3 and 11.3.4.

Find out whether your deck needs a repair or a rebuild

Hamish lifts a few boards, checks the frame and tells you which it is. You get the scope in writing before you get the price.

Get my free quoteCall 0420 221 420

How it works

Lift the Boards, Check the Frame, Then Price It

A deck repair quoted from the top of the boards is a guess. The part that decides the price is underneath.

  1. Step 01

    Boards up, Frame Checked

    We lift a few boards over the suspect area and probe the joists, bearers and posts. Everything we lift goes back down, whether you go ahead or not.

  2. Step 02

    The Written Scope

    What gets replaced, what stays, the timber and fixings going in, and what caused the failure so that gets fixed too. Anything we can’t see until the old timber is out is named as a provisional item.

  3. Step 03

    Fixed Price, Dated Start

    The price is fixed against that scope and you get the start date in writing. Most repairs are finished inside a week.

Get my free quote Call 0420 221 420

Questions

Deck Repair Questions We Get Asked Before a Quote

If yours isn’t here, ring and ask. You’ll get a straight answer rather than a booking form.

Can you replace just the boards and keep the frame?

Yes, if the frame is sound, and on a lot of decks it is. We check the joist tops and bearers first, because new boards over a frame that is already going look fixed for a couple of years and then cost you both jobs.

Is my deck worth repairing?

Usually, if it feels solid underfoot and the damage is in the boards, the fixings or the balustrade. If it moves, dips, or is soft along the joist lines, the frame is involved, and we need to look underneath before we can give you an honest answer.

Is a loose balustrade worth fixing straight away?

Yes. Most deck repairs are about wear, but a balustrade is about safety. If a handrail moves when you lean on it, the posts holding it are usually loose or rotten at the base, and it is the only thing between someone and the drop. It is normally a short job, and any section we replace is built to the current rules.

Can you match my existing decking timber?

We match the species, profile and width where they are still made, which is what matters for how the deck performs and how it looks in a year. New timber reads lighter than weathered boards for a season or two, and oiling narrows the difference.

Do I need council approval to repair a deck?

Repairing or replacing parts of a deck like for like generally doesn’t need approval in NSW. Making it bigger, higher or a different shape can. If your job crosses that line, we tell you which approval applies before we quote it.

Do I need a written contract for a deck repair?

In NSW, residential building work worth between $5,000 and $20,000 needs a small works contract. Work over $20,000 needs a full contract and home building compensation insurance. Either way, you get the scope in writing before the price.

How long does a deck repair take?

Most take one to five days on site. Boards and a balustrade sit at the short end. Replacing joists and bearers under an existing deck, or resetting footings, sits at the long end. The start date is in writing before we begin.

Why do deck screws rust so quickly near the beach?

Salt air corrodes galvanised screws far faster than inland air does, and a corroded screw loses its grip and stains the timber around it. Within the salt zone we refix in stainless steel. On an otherwise sound deck, that can be most of the repair.

Your builder

Hamish Williamson

Director and licensed builder, Williamson Builds, licence 399743C

Hamish has spent more than ten years on the tools, including high-end residential work in Dee Why and Annandale before starting Williamson Builds on the Central Coast. He checks every deck repair himself, and writes and checks the technical content on this page, including the warning signs, the repair-or-rebuild call, the balustrade rules and every answer in the FAQ above.

NSW licence 399743C · Certificate III in Carpentry · Certificate IV in Building and Construction. Search the licence number on the Building Commission NSW register.

Last reviewed September 2026 · reviewed every six months

More about Hamish and Williamson Builds

Get my free quoteCall 0420 221 420

Hamish Williamson, director and licensed builder at Williamson Builds

Start here

Tell Us What’s Wrong With the Deck

A sentence and a few photos, ideally one from underneath, is enough for us to tell you whether it sounds like a repair or a rebuild.

  • Licence 399743C
  • Public liability insured
  • 5/5 from 25+ Google reviews

Get a free quote

Name

We reply within one working day. No obligation, no sales call.

Call 0420 221 420