What Is a Load-Bearing Wall?
A load-bearing wall holds up part of the house above it, usually the roof, the ceiling or an upper floor, and carries that weight down to the footings. A wall that only divides two rooms is a partition.
The difference matters because you can’t see it. Both kinds are framed, lined and painted the same way. Take out a partition and you are left with a gap in the floor and ceiling to patch. Take out a load-bearing wall without giving its load somewhere else to go, and the ceiling sags, doors upstairs start to stick and cracks open up along the cornice. In the worst case, part of the roof or floor above comes down.
How can you tell if a wall is load-bearing?
You can’t be certain from inside the room, but a few clues make it more likely.
None of them is proof. A wall that shows none of these signs can still be carrying a beam end, and one that looks central can be doing nothing. The real answer comes from someone getting into the roof space and under the floor, and it is confirmed by the engineer. Until then, these are the signs worth noting:
- It runs across the ceiling joists, not alongside them.
- It sits near the middle of the house, roughly under the ridge of the roof.
- There is another wall directly above it on the next storey.
- In the roof space, timber props or a beam come down onto the top of it.
- It is an original wall of the house, not one added in a later renovation.
Is the wall between a kitchen and living room usually load-bearing?
In older single-storey houses it often is, because that wall tends to run down the middle of the house under the ceiling joists.
It is the wall people most want gone, and it is the reason a lot of kitchen renovations on the Central Coast need a builder and not only a kitchen company. Newer houses with trussed roofs often carry the roof on the outside walls, which can leave the internal walls free. Often is not always, so it still gets checked.
Do You Need Council Approval to Remove a Wall in NSW?
Yes. Removing or moving an internal wall is not exempt development in NSW, so you need a complying development certificate or a development application before work starts.
This surprises people, because a like-for-like kitchen or bathroom renovation usually is exempt. The Housing Industry Association’s guide to kitchen and bathroom renovations as exempt development explains where the line sits: exempt work must not change the configuration of a room “whether by removal of an existing wall, partition or other means.” It goes on: “If you are moving or demolishing an existing wall or building a new wall as part of any renovation it is no longer considered exempt development”, and “this is the case even if the wall is non-loadbearing.”
The usual path for a house is complying development. The NSW Planning Portal says internal alterations can be complying development, including new openings and “changes to the internal floor layout.”
What is the difference between a CDC and a DA?
A complying development certificate, or CDC, is the fast track. A development application, or DA, is a full assessment by council.
The Planning Portal describes complying development as “a fast-tracked application process that combines planning and construction approval”, decided by council or a certifier, with approvals “issued in as little as 20 days.” The application needs design plans and structural plans, which is where the engineer comes in.
If the job doesn’t fit the complying rules, it goes to council as a DA. NSW’s guide to the approvals a building project needs says work under a development consent can’t start until a construction certificate has been issued and a principal certifier has been appointed. Either way, the approval comes before the wall is touched.
What changes on heritage or flood affected land on the Central Coast?
The fast track may not be available, and the job is more likely to need council’s consent.
Central Coast Council’s heritage page counts 22 state heritage listed items and 364 local heritage items, and says listed properties “require development approval for development work including alterations”. Flooding, bushfire and other hazards are recorded on a property’s Section 10.7 planning certificate, according to Council’s page on development in flood zones. Checking the certificate early saves designing a job twice.
What if you live in a unit or townhouse?
You need the owners corporation’s approval as well, and it has to come first.
NSW’s strata renovation rules class changes that affect the structure as major renovations, give “moving a structural internal wall” as an example, and require a special resolution at a general meeting. If the work will change the structure, “for example, removing a wall”, the owner must also give the owners corporation 14 days’ written notice before it starts.
Who Can Legally Remove a Load-Bearing Wall?
A licensed builder, working to a structural engineer’s design.
NSW requires a licence for residential building work valued at more than $5,000 in labour and materials, and says “a general builder can do any work that is residential building work.” Taking out a structural wall is never only carpentry. There is temporary propping, a new beam and posts, wiring and sometimes plumbing inside the wall, then plastering, flooring and painting to finish. One licence over all of it means one person answers for whether the house is still held up properly. Our guide to whether you need a carpenter or a builder covers where that line falls on other jobs.
The beam is the engineer’s call. NSW describes structural engineering as being able to “predict and calculate the stability, strength and rigidity of built structures”, and that calculation sets the size of the beam, what holds up each end and whether the footings underneath can take the load.
The paperwork follows the contract value. A job over $5,000 needs a written contract, and over $20,000 the builder must take out home building compensation cover and give you the certificate before taking any payment. You can check a builder’s licence on the NSW Government site before you sign.
Can you remove a load-bearing wall yourself?
It is not a DIY job.
The wall is holding weight for the whole time it takes to remove it. The approval, the engineering and the temporary support all have to be right before the first stud is cut, and a mistake shows up in the ceiling above your head. Leave it to a licensed builder.
What Is Involved in Taking Out a Load-Bearing Wall?
The load is given a new path to the ground before the old one is taken away.
Every job follows the same order, and skipping a step is where the trouble starts:
- Look first. The builder checks the roof space and the subfloor to see what the wall carries and what is under it.
- Engineer’s design. The engineer sizes the beam, the posts at each end and anything needed at the footings.
- Approval. The plans go in for a CDC or a DA, with strata approval first if it applies.
- Temporary support. The structure above is propped before any framing comes out.
- Wall out, beam in. The new beam goes in, in timber or steel, with posts that carry its ends down to solid support.
- Services. Wiring and pipes that ran through the wall are rerouted by a licensed electrician and plumber.
- Making good. The ceiling, floor, cornice and paint are finished so the two rooms read as one.
Will you see the beam afterwards?
That depends on the design. A beam can sit below the ceiling as a bulkhead, or be set up into the ceiling space so the ceiling runs through flat.
A flush beam looks cleaner and takes more work, because the ceiling joists have to be hung off it. Decide which one you want while the engineer is still drawing, not once the ceiling is open.
What about asbestos in the wall?
If the house was built or renovated before 1990, treat the wall linings as possible asbestos until they have been checked.
The NSW Government’s asbestos site estimates that 1 in 3 houses in NSW built or renovated between 1945 and 1990 contain it, and lists “ceilings and internal walls” among the places it turns up. Its advice is blunt: “If you think it might be asbestos, treat it like it is. Stop work, clear the site, and get help.” On an older house, have the linings tested before demolition, so nobody finds out with a hammer.
What happens to the floor where the wall stood?
There will be a strip to fill, because floor coverings stop at each side of a wall.
With timber boards, new boards can be laced in and the floor sanded so the join disappears. With tiles or older vinyl, a clean match is harder, and it can make sense to renew the floor across both rooms. It belongs in the scope from the start, which is why a wall removal often sits inside a wider home renovation.
What Should You Ask a Builder Before They Quote?
Ask who is designing the beam, who is getting the approval and what happens if the wall hides something.
A builder who has done this before will have a clear answer to each of these. If the reply to the approval question is that you won’t need one, get another opinion.
- What is your licence number, and is it a general building licence?
- Who engages the structural engineer, and will I see the drawings?
- Which approval does this job need, and who lodges it?
- What have you checked in the roof space and under the floor?
- What is provisional in the price, and what would make it change?
- How will the ceiling and floor be finished where the wall was?
- Is the house old enough to need an asbestos check first?
So Should You Remove the Wall?
If opening the room will change how you live in the house, it is usually worth doing, and it is only worth doing in the right order: check what the wall carries, get the engineer’s design, get the approval, then build.
Most walls can come out. What varies is how much beam, how many posts and how much making good it takes, and you only find that out by looking above and below the wall before anything is drawn. Homeowners who start with the look and the engineer end up with a fixed scope. Those who start with a sledgehammer end up with a problem.
Williamson Builds is a licensed general building contractor, licence 399743C, working across all of the Central Coast, with Newcastle and Sydney by arrangement for larger jobs. Hamish holds a Certificate IV in Building and Construction and a Certificate III in Carpentry. This guide is general information for NSW, and your certifier or council will confirm what applies to your address.