Renovations · 5 minute read

Renovating a Rental Property NSW – What Landlords Can Do With Tenants In

  • 10+ years on the toolsSydney and the Central Coast
  • Licence 399743CVerifiable on the NSW register
  • $10M public liabilityInsured with NRMA
  • Cert IV BuildingPlus Cert III Carpentry
  • 5/5 on GoogleFrom 15+ reviews

The short answer

A NSW landlord can renovate a tenanted property with the tenant’s cooperation, or end the lease on the significant renovations or repairs ground when the work needs the home empty. That ground needs 60 or 90 days’ notice, a signed statement explaining the work, and the work must start within 2 months of the tenant leaving. Necessary repairs only need 2 days’ notice to enter.

Notice to end for renovations
90 days, or 60 for a fixed term of 6 months or less
Work must start
Within 2 months of the tenant leaving
Re-letting
Not for 4 weeks after the termination date
Entry for necessary repairs
At least 2 days’ notice

Can a Landlord Renovate While Tenants Are Living in the Property?

Yes, for work the tenant agrees to, or for necessary repairs and maintenance, which a landlord can enter to carry out with at least 2 days’ notice each time. A renovation that goes beyond necessary repairs depends on the tenant’s cooperation, because tenants have a right to reasonable peace, comfort and privacy.

NSW Fair Trading’s list of minimum notice periods for access to a rental property sets out when a landlord, agent or tradesperson can enter without the tenant’s consent. Assessing or carrying out necessary repairs or maintenance needs at least 2 days’ notice each time. Urgent repairs, such as a burst pipe or a gas leak, need no notice. A routine inspection needs 7 days’ written notice and is limited to four a year.

Those rules were written for repairs, not for a crew stripping a bathroom for three weeks. In practice, renovating around a household works when the tenant has agreed to the plan in writing: which rooms, which days, what hours, where the trades park and what happens to the tenant’s belongings. A property manager who sets that up before the first quote saves everyone a dispute later.

Smaller jobs fit this model well. Replacing a rotten deck, a run of fencing, internal doors or a single room of flooring can usually be done in a few visits with notice. Work that removes the only bathroom or the kitchen is a different conversation.

Should rent be reduced while a renovation is under way?

NSW Fair Trading suggests a landlord who needs work done can consider offering the tenant a rent reduction or a pause in rent while it is carried out, instead of ending the tenancy.

That suggestion sits on Fair Trading’s landlord ending a tenancy page, beside the renovation ground. Agreeing it in writing, with dates, keeps the arrangement clear if the work runs over.

When Can a Landlord End a Lease to Renovate in NSW?

Since 19 May 2025, a landlord can end a tenancy for renovations only when the work is significant, the property must be empty for it to be done properly, and it will start within 2 months after the tenant moves out. The notice has to come with a signed written statement explaining the work.

Fair Trading’s landlord ending a tenancy page describes a significant renovation or repair as one expected to have a big impact on the tenant’s use of the property, for example because it takes a long time, extends through the house or makes essential areas unusable. A landlord cannot use the ground while Fair Trading or the Tribunal has ordered them to fix the property, such as under a rectification order.

The notice periods are on Fair Trading’s minimum notice periods for ending a tenancy page:

  • Periodic agreement: at least 90 days’ notice.
  • Fixed term of more than 6 months: at least 90 days’ notice.
  • Fixed term of 6 months or less: at least 60 days’ notice.
  • The written statement must explain why the work is significant and why the property must be vacant, give the proposed start date, and be signed and dated by the landlord.
  • Fixed terms: the termination date cannot fall before the end of the fixed term, because this is not one of the grounds that can end a fixed term early.
  • After the tenant leaves, the property cannot be re-let for 4 weeks after the termination date.

Can a tenant challenge a renovation notice?

Yes. If a notice is given because a tenant tried to enforce their rights, such as asking for repairs, the tenant can apply to the Tribunal for an order that it was retaliatory and has no effect.

Fair Trading’s notice periods page covers retaliatory eviction. A notice backed by a real builder’s scope and start date is much easier to stand behind than one written around a vague plan.

Which Renovations Usually Need the House Empty?

From a builder’s side, work that takes the only bathroom or the kitchen out of use, opens walls or floors through several rooms, or runs for more than a few weeks is rarely workable around a household. Dust, noise, isolated water or power and open subfloors are the usual reasons.

A bathroom renovation is the clearest example. Once the room is stripped, the tenant has no shower until the waterproofing is in and has cured, the tiles are down and the fit-off is done. A kitchen renovation removes the sink and cooking for the length of the job. Structural work, such as taking out a wall or levelling a sagging floor, can make parts of the house unsafe to occupy until it is finished.

Exterior work is different. Decks, pergolas, fences, roof-adjacent carpentry and window replacements usually leave the tenant with a working home, as long as access and safety are planned. That is where staging helps: do the outside work while the tenancy runs, and leave the rooms that need the house empty for a natural vacancy or for the renovation ground with full notice.

Home renovation on the Central Coast
A renovation that opens walls through several rooms is the kind of work that usually needs the house empty.

What Paperwork Should a Landlord Have Before the Work Starts?

A written scope and contract from a licensed builder, the approvals the work needs, and, if the tenancy is ending, a signed statement whose dates match the builder’s program. Each document backs up the others.

NSW Fair Trading’s page on contracts for residential building work says the builder must give a written contract for work over $5,000 including GST, with a more detailed large job contract above $20,000. It also says to check the contractor’s licence before signing.

Approvals depend on the rooms. Our guides to bathroom renovation council approval and kitchen renovation council approval cover what Central Coast homes can change without a certificate, and units also need the owners corporation’s consent, set out in strata bathroom renovation approval.

A renovation is also a chance to fix the items that would fail the rental minimum standards anyway, such as a leaking shower, a soft deck or a door that will not lock, so the next tenancy starts clean.

So Should You Renovate With Tenants in or Wait for a Vacancy?

Renovate with tenants in when the work is outside or room by room and the tenant has agreed in writing; wait for a vacancy, or use the renovation ground with full notice, when the kitchen, the bathroom or the structure is coming apart.

Either way, start with the builder’s scope. It tells the landlord how long each room is out of use, gives the property manager something concrete to put to the tenant, and supplies the dates the written statement has to carry.

Williamson Builds works with landlords, property managers and strata managers across all of the Central Coast, with Newcastle and Sydney by arrangement for larger jobs, under builder’s licence 399743C with $10 million in public liability cover. Our home renovations page covers how a whole-house job is run. This guide is general information for NSW and is not legal advice.

Written by

Hamish Williamson

Director and licensed builder, Williamson Builds, licence 399743C

Hamish has spent more than ten years on the tools, including high-end residential work in Dee Why and Annandale before starting Williamson Builds on the Central Coast. He checks every guide on this site before it goes up.

NSW licence 399743C · Certificate III in Carpentry · Certificate IV in Building and Construction. Search the licence number on the Building Commission NSW register.

Last reviewed 6 November 2026

More about Hamish and Williamson Builds

GET MY FREE QUOTECall 0420 221 420

Hamish Williamson, director and licensed builder at Williamson Builds

Start here

Tell Us About Your Job

A sentence and a couple of photos is enough for us to know how to help. If someone else is the better call, we’ll say so in the reply.

  • Licence 399743C
  • Public liability insured
  • 5/5 from 25+ Google reviews

Get a free quote

Name

We reply within one working day. No obligation, no sales call.

Call 0420 221 420